An informed commuter is a prepared commuter.
Southern Nevada is growing, and that can mean construction, service improvements, and special events may impact your commute.
Drivers are encouraged to plan their commutes by checking ahead of time for traffic conditions as well as leaving earlier for their destinations.
To help you plan your travel, current detours and restrictions are posted below. This page is updated every Thursday.
Weekly Traffic Alerts
The RTC gathers information weekly and publishes updates on projects that may impact your travel each Thursday.
NDOT Sunset Rd Paving Project
- Nightly (11 p.m. to 5 a.m.) Sunday night through Friday morning, through Thursday, July 9:
- Lane reductions on Sunset Road from South Las Vegas Boulevard to Annie Oakley Drive
- Left and right turn lanes/pockets as well as some right turn lanes will be closed periodically
- Speed limit reduced to 35 mph throughout the work zone
- Nightly (11 p.m. to 5 a.m.) Sunday night through Friday morning, through Monday, July 13:
- Sunset Rd/Grier Drive to Airport Connector ramp closed
- Intermittent closures from Airport Connector to westbound I-215
- Intermittent closures from Airport Connector to Hidden Well Rd
- Intermittent closures from Airport Connector to Warm Springs Rd
- Reduced lanes from southbound Airport Connector from Grier Dr overpass to I-215
- For more information, please visit: https://www.dot.nv.gov/projects-programs/transportation-projects/sunset-road-paving-project
- Nightly (11 p.m. to 5 a.m.) Sunday night through Friday morning, through Thursday, July 9:
NDOT U.S. 95 Near Boulder City Pavement Preservation Project
- 24/7, Monday, May 11 through Monday, June 22:
- Northbound and southbound U.S. 95 reduced to one lane between MP 50 and MP 55, south of I-11/US-95 junction.
- Lane closures will shift between the left and right sides of the roadway as work progresses.
- For more information, please visit: https://www.dot.nv.gov/projects-programs/transportation-projects/u-s-95-u-s-pavement-preservation-project-near-boulder-city
NDOT, Flamingo Rd Safety Improvement Project
Nightly (8 p.m. to 5 a.m.) Monday, June 1 through Friday, June 19:
- Intermittent lane reductions on East Flamingo Road between Paradise Road and Pecos Road
- Traffic may be reduced to a single lane for short durations
- Speed limit reduced to 35 mph throughout the work zone
NDOT, RTC Launching I-11 SafeTech Corridor Project in Central Las Vegas Valley
- 24/7 through September:
- High Occupancy Vehicle (HOV) lanes closed in both directions of I-11/U.S. 95 between Rancho Drive and Rainbow Boulevard
- For more information, please visit: https://www.ndotsafetech.com/
NDOT, U.S. 95 Pavement Preservation Project
No Updates: 6/4
24/7, Monday, May 11 through Monday, June 22:
- Northbound and southbound U.S. 95 reduced to one lane between MP 50 and MP 55, south of I-11/US-95 junction.
- Lane closures will shift between the left and right sides of the roadway as work progresses.
For more information, please visit: https://www.dot.nv.gov/projects-programs/transportation-projects/u-s-95-u-s-pavement-preservation-project-near-boulder-city
