An informed commuter is a prepared commuter.
Southern Nevada is growing, and that can mean construction, service improvements, and special events may impact your commute.
Drivers are encouraged to plan their commutes by checking ahead of time for traffic conditions as well as leaving earlier for their destinations.
To help you plan your travel, current detours and restrictions are posted below. This page is updated every Thursday.
Weekly Traffic Alerts
The RTC gathers information weekly and publishes updates on projects that may impact your travel each Thursday.
Henderson 215 Project
- No New Updates
- I-215
- Speed Limit reduced to 55mph
- St Rose Pkwy to Stephanie St
- Lane reductions at night, as needed (storm drain install, removals, retaining and sound walls, ITS)
- Ramps
- Overnight Ramp Closures 9:00pm to 6:00am
- Thru November 2nd, watch for closures of on and off-ramps in the westbound I-215 direction between Stephanie St and Pecos Rd
- I-215 Eastbound off-ramp to Pecos
- Upcoming lane restrictions on the off-ramp
- I-215 Westbound off-ramp to Pecos
- Starting early November
- Lane restrictions on the off-ramp
- Overnight Ramp Closures 9:00pm to 6:00am
- Surface Streets
- Green Valley Pkwy, between I-215 and Village Walk Dr
- Thru 11/3, lane restrictions on southbound Green Valley Pkwy
- St Rose Pkwy and I-215, Paseo Verde Pkwy at St Rose Pkwy
- Lane restrictions on St Rose Pkwy and also Paseo Verde Pkwy (daytime restrictions possible)
- Paseo Verde Pkwy at St Rose Pkwy
- Lane restrictions on Paseo Verde Pkwy and NB St Rose Pkwy
- Green Valley Pkwy, between I-215 and Village Walk Dr
- Bike Paths & Trails
- Bike path on St Rose Pkwy between Coronado Center Dr and Paseo Verde Pkwy
- CLOSED long-term
- 215 Trail, Green Valley Pkwy to Valle Verde Dr
- Closed through late November
- Detoured to Paseo Verde Pkwy
- Closed through late November
- 215 Trail, Arroyo Grande Blvd to Stephanie St
- Long-term closure
- Detoured to Paseo Verde Pkwy
- Bike path on St Rose Pkwy between Coronado Center Dr and Paseo Verde Pkwy
- For more information, please go to https://henderson215.com/construction-updates/
Maryland Pkwy Bus Rapid Transit (BRT) Project
- Starting 10/6 Bonneville Ave between MLK Blvd and Main St will have travel lanes shifted to the north, 2 lanes open WB and 1 lane open EB.
- Carson Ave 7th St to 13th St, work will begin on the north half of the rd.
- Maryland Pkwy, Russell Rd to Tropicana Ave, Work hours 6:00 am to 2:00 pm. One lane open in each direction during the day. Two lanes open in each direction at night.
- Maryland Pkwy, Tropicana Ave to Flamingo Rd, 2 lanes open in each direction between 6:00AM – 2:00PM.
- Maryland Pkwy, Rochelle to Flamingo, Daytime 2 lanes open in each direction; Nighttime 1 lane open NB. No SB lane impact. 9AM – 5PM
- Maryland Pkwy, Flamingo Rd to Desert Inn Rd, Work hours 8:00 pm to 7:00 am. Two lane open NB during the day. One lane open NB at night.
- Maryland Pkwy, Desert Inn Rd to Sahara Ave, Work hours 8:00 pm to 7:00 am. Two lanes open in each direction during the day. One lane open in each direction at night.
- Maryland Pkwy, from Sahara Ave to Franklin, Work hours 5:00 am to 1:00 pm. One lane open in each direction. Intermittent closures at Oakey Blvd and Maryland Pkwy for traffic signal work, pending coordination with NV Energy.
- Maryland Pkwy, Bonneville to Carson Ave, Work hours 5:00 am to 1:00 pm. One lane open in each direction.
- Carson Ave, Casino Center Blvd to 6th St, 5AM – 1PM (longer ours possible) One lane in each direction.
- Carson Ave, 7th St to 13th St One lane open in each direction, 7AM – 3PM
- Bonneville Ave, Casino Center Blvd to MLK Blvd, Work hours 5:00 am to 1:00 pm. One lane open westbound, two lanes open Eastbound.
- Alta Dr between MLK Blvd to Tonopah Dr, one lane open in each direction between 5:00 am and 1:00 pm.
- Tonopah Dr, between Alta Dr and Wellness Way, open to northbound traffic only between 5:00 am and 1:00 pm.
- Wellness Way between Tonopah Dr and Shadow Ln, open to eastbound traffic only between 5:00 am and 1:00 pm.
- November 13-14th The south half of Bonneville Ave between MLK Blvd and Main St will be paved, no change in traffic control.
- For more information, please go to https://marylandparkway.com/.
NDOT 215 Pavement Preservation Project
- No New Updates
- Eastbound Warm Springs Rd on-ramp to westbound 215 closed
- Eastbound Warm Springs Rd at westbound 215 – right lane closure
- No New Updates
NDOT 215 Preservation Project to Impact Airport Connector, Frontage Roads
- No new Updates
NDOT I-15 South Widening Project, Sloan to Warm Springs
- 6:00 a.m. to 3:00 p.m. Friday, Nov. 14: Northbound I-15 off-ramp to St. Rose Pkwy closed
- SB I-15 reduced to 2 lanes between Starr Ave and Sloan Rd, Nightly 8PM – 5AM Tues. Nov.11th to Fri Nov.14th
- Northbound & Southbound I-15 reduced to two lanes from Sloan Rd to Warm Springs
- Intermittent on and off-ramp closures along SB I-15 between Silverado Ranch Blvd and Sloan Rd
- For more info, visit https://www.dot.nv.gov/projects-programs/transportation-projects/i-15-south-project
